问题
I am using Spring 3.2
and Quartz 2.2
.
My target Class
and method
,
public class Producer {
public void executeListener() {
System.out.println(" Test Method . ");
}
}
In my spring applicationContext.xml
,
<bean id="producer" class="com.service.Producer" />
<bean id="jobDetail" class="org.springframework.scheduling.quartz.MethodInvokingJobDetailFactoryBean">
<property name="targetObject" ref="producer" />
<property name="targetMethod" value="executeListener" />
<property name="concurrent" value="false" />
</bean>
<bean id="simpleTrigger" class="org.springframework.scheduling.quartz.SimpleTriggerFactoryBean">
<property name="jobDetail" ref="jobDetail" />
<!-- 10 seconds -->
<property name="startDelay" value="10000" />
<!-- repeat every 5 seconds -->
<property name="repeatInterval" value="5000" />
</bean>
<bean id="mySheduler" class="org.springframework.scheduling.quartz.SchedulerFactoryBean">
<property name="triggers">
<list>
<!-- <ref bean="cronTrigger" /> -->
<ref bean="simpleTrigger" />
</list>
</property>
</bean>
The above code is working and the executeListener()
nethod is executing continously with the interval of 5 seconds
and the starting delay will be 10 sec
.
I have tried in spring controller
to update the trigger as ,
@Controller
public class SpringController {
@Autowired
org.springframework.scheduling.quartz.SchedulerFactoryBean myScheduler;
@Autowired
org.springframework.scheduling.quartz.SimpleTriggerFactoryBean oldTrigger;
@RequestMapping(value="/reSheduleTrigger.html",method=RequestMethod.POST)
public @ResponseBody String reSheduleTrigger(@RequestParam(value="triggerInSec") String triggerInSec ){
System.out.println("----------------- Changing the repeat interval request -----------");
// obtain a builder that would produce the trigger
TriggerBuilder<SimpleTrigger> tb = oldTrigger.getObject().getTriggerBuilder();
Trigger newTrigger = tb.withSchedule(simpleSchedule().withIntervalInSeconds(triggerInSec).build());
myScheduler.getObject().rescheduleJob(oldTrigger.getObject().getKey(),newTrigger );
return "success";
}
}
But I am getting the compile time error Trigger newTrigger = tb.withSchedule(simpleSchedule().withIntervalInSeconds(triggerInSec).build());
.
My need :
I want to reshedule
the job to execute the executeListener()
method with the 2 sec
interval dynamically.
Thanks.
回答1:
Try one of the following:
Trigger newTrigger = tb.withSchedule(SimpleScheduleBuilder.simpleSchedule().withIntervalInSeconds(2)).build();
or
Trigger newTrigger = tb.withSchedule(SimpleScheduleBuilder.repeatSecondlyForever(2)).build();
Both are syntactically valid. It looks like your issue with Trigger newTrigger = tb.withSchedule(simpleSchedule().withIntervalInSeconds(triggerInSec).build());
is caused by incorrect bracketing. ie build() should not have an extra bracket after it, as it returns a trigger.
来源:https://stackoverflow.com/questions/21375317/spring-quartz-resheduling-or-updating-the-trigger