I have a Spring-Boot application with a bean running a scheduled task at about 1 minute intervals, and this bean has a @PreDestroy
method.
Is there a solution for allowing a task which is currently being executed to complete - or at least given some time to complete - before the life cycle reaches the pre-destroy phase?
回答1:
You need update configuration of ThreadPoolTaskScheduler
. Set true for waitForJobsToCompleteOnShutdown
(method setWaitForTasksToCompleteOnShutdown
).
From documentation:
Set whether to wait for scheduled tasks to complete on shutdown, not interrupting running tasks and executing all tasks in the queue. Default is "false", shutting down immediately through interrupting ongoing tasks and clearing the queue. Switch this flag to "true" if you prefer fully completed tasks at the expense of a longer shutdown phase.
回答2:
Starting from Spring Boot 2.1.0, you can use this:
@Bean
TaskSchedulerCustomizer taskSchedulerCustomizer() {
return taskScheduler -> {
taskScheduler.setAwaitTerminationSeconds(60);
taskScheduler.setWaitForTasksToCompleteOnShutdown(true);
};
}
TaskSchedulerCustomizer
will be used to modify configured ThreadPoolTaskScheduler
Details:
- ExecutorConfigurationSupport
- TaskSchedulerCustomizer
回答3:
@Matej is right. Some thing like this should do the trick
@Bean
public ThreadPoolTaskScheduler setSchedulerToWait(ThreadPoolTaskScheduler threadPoolTaskScheduler){
threadPoolTaskScheduler.setWaitForTasksToCompleteOnShutdown(true);
return threadPoolTaskScheduler;
}
来源:https://stackoverflow.com/questions/43664259/spring-scheduled-task-graceful-shutdown