问题
I have a vNext release that is triggered by a gated check-in build. The associated changeset is linked with an work item.
What I have to check in order to have the linked work item displayed in the Change Summary tab of the release as in this link?
来源:https://stackoverflow.com/questions/30193673/work-items-associated-with-releases