How to blend CMMI and Scrum? [closed]

佐手、 提交于 2019-12-03 05:13:49

问题


I work in a shop that is certified at CMMI level 5. This certification is important because it gives us access to certain customers and contracts. I'm looking at how to blend Scrum with CMMI. I've found some info on mixing Scrum with CMMI-3, but quite a bit of it is "hand wavy" and wouldn't hold up to intense scrutiny. Specifically, the organizational KPAs seem challenging.

What experiences have you had (good and bad) mixing the two processes?


回答1:


This seems an interesting paper by the SEI folks at Carnegie Mellon (not just about Scrum though):

CMMI and Agile are compatible. At the project level, CMMI focuses at a high level of abstraction on what projects do, not on what development methodology is used, while Agile methods focus on how projects develop products. Therefore, CMMI and Agile methods can co-exist

CMMI or Agile: Why not embrace both (PDF)




回答2:


Here is an experience report on the results of introducing Scrum into a CMMI Level 5 environment to replace waterfall projects for large defense and healthcare contracts (pdf).

Abstract:

Projects combining agile methods with CMMI1 are more successful in producing higher quality software that more effectively meets customer needs at a faster pace. Systematic Software Engineering works at CMMI level 5 and uses Lean Software Development as a driver for optimizing software processes. Early pilot projects at Systematic showed productivity on Scrum teams almost twice that of traditional teams. Other projects demonstrated a story based test driven approach to software development reduced defects found during final test by 40%. We assert that Scrum and CMMI together bring a more powerful combination of adaptability and predictability than either one alone and suggest how other companies can combine them.

HTH,




回答3:


I just happen to find a blog on this exact topic: Agile CMMI blog

A starting point for a discussion on marrying Agile methods and CMMI.

It links to several articles

  • Agile CMMI: No Oxymoron
  • Agile Programming and the CMMI: Irreconcilable Differences?

It found the whole of interest so I decided to share it here.




回答4:


Another recent article providing real life experience on this topic is "Mature Scrum at Systematic", co-writtent by Carsten Ruseng Jakobsen, Jeff Sutherland




回答5:


In addition to the previously mentioned documents, I found another one: Agile Methods and CMMI: Compatibility or Conflict? The emphasis of this paper is on Extreme Programming (XP) and how its methods can be applied within an organization attempting to remain compliant with the CMMI framework. Although it isn't Scrum, it might be an interesting read.




回答6:


Another interesting Jeff Sutherland's paper on that subject is "Scrum and CMMI Level 5: The Magic Potion for Code Warriors"

Is is said : "Results show that projects combining Agile Methods with CMMI 5 are more successful in producing higher quality software that more effectively meets customer needs at a faster pace."

If you can read french, here's a very good article on that subject : Synergies entre CMMI et les Méthodes Agiles




回答7:


See short but detailed comparison at http://www.processgroup.com/pgpostmar09.pdf




回答8:


On EuroStar 2009 conference Gittie Ottosen spoke about how they do agile at their company. What's impressive is that this company Systematic is creating software for air-crafts, military etc. They do it in compliance with CMMI 5, ISO 9001 and AQAP 150&2110. So I guess agile can be applied to systems with high regulations. Maybe try to look up that presentation, and try to get more info from him.



来源:https://stackoverflow.com/questions/257926/how-to-blend-cmmi-and-scrum

易学教程内所有资源均来自网络或用户发布的内容,如有违反法律规定的内容欢迎反馈
该文章没有解决你所遇到的问题?点击提问,说说你的问题,让更多的人一起探讨吧!