I would like to breakup certain phases in the maven life cycle into sub phases. I would like to control the execution flow from one sub-phase to another, sort of like with ant dependencies.
For example, I would like to use the NSIS plugin in order to package up my project into an installer at the package stage, AFTER my project had been packaged into a war file. I would like to do all that at the package phase.
Is that possible?
Thanks
I had the same problem. look at How to perform ordered tasks in Maven2 build. for some reason the different goals bound to a phase are stored in a hash map or other unordered structure which makes the execution order random. my solution was to spread the tasks to different phases but I dont think there is much sence for it in your case (nsis packaging is not pre integration test). you could do one of the following:
1) try your luck and see if Maven chosses the right order for you (you probably tried that already)
2) use standalone plugin - run the goal outside the lifecycle. something like: mvn package org.codehaus.mojo:nsis-maven-plugin:1.0:compile.
3) separate them into module: have a parent pom containing two sub modules, one - your war project and the other for the nsis project.
4) use a custom lifecycle by changing the type, in your case you can use "exe". this is done by using a custom plugin extension (guide to using extension)
5) use the jetspeed-mvn-maven-plugin. I have never used it but it seems relevant to your needs.
hope this gives you new ideas.
Ronen
来源:https://stackoverflow.com/questions/2509513/how-can-i-execute-several-maven-plugins-within-a-single-phase-and-set-their-resp