TestNG - run 1 suite in parallel and other sequentially

后端 未结 0 1030
情书的邮戳
情书的邮戳 2021-01-17 15:49

I have the following situation:

I have 2 Suites, one which I want multiple packages to all run in parallel. Then a second suite where I want sequential tests to run.<

相关标签:
回答
  • 消灭零回复
提交回复
热议问题