DAX: How to override one component of an evaluation context

后端 未结 0 628
梦毁少年i
梦毁少年i 2021-01-05 23:31

I\'m creating a line and stacked column chart and having a problem with the measure that should be plotted on the line. The x-axis is time (one entry for each month). I have

相关标签:
回答
  • 消灭零回复
提交回复
热议问题