I have a program that needs to start on 1/1/09 and when I start a new day, my program will show the next day. This is what I have so far:

GregorianCalendar s         


        
相关标签:
2条回答
  • 2021-01-04 21:56

    If you can swing it requirement wise, move all your date/time needs to JODA, which is a much better library, with the added bonus that almost everything is immutable, meaning multithreading comes in for free.

    0 讨论(0)
  • 2021-01-04 22:08

    The Calendar object has an add method which allows one to add or subtract values of a specified field.

    For example,

    Calendar c = new GregorianCalendar(2009, Calendar.JANUARY, 1);
    c.add(Calendar.DAY_OF_MONTH, 1);
    

    The constants for specifying the field can be found in the "Field Summary" of the Calendar class.

    Just for future reference, The Java API Specification contains a lot of helpful information about how to use the classes which are part of the Java API.


    Update:

    I am getting the error found void but expected int, in 'newDay = startDate.add(5, 1);' What should I do?

    The add method does not return anything, therefore, trying to assign the result of calling Calendar.add is not valid.

    The compiler error indicates that one is trying to assign a void to a variable with the type of int. This is not valid, as one cannot assign "nothing" to an int variable.

    Just a guess, but perhaps this may be what is trying to be achieved:

    // Get a calendar which is set to a specified date.
    Calendar calendar = new GregorianCalendar(2009, Calendar.JANUARY, 1);
    
    // Get the current date representation of the calendar.
    Date startDate = calendar.getTime();
    
    // Increment the calendar's date by 1 day.
    calendar.add(Calendar.DAY_OF_MONTH, 1);
    
    // Get the current date representation of the calendar.
    Date endDate = calendar.getTime();
    
    System.out.println(startDate);
    System.out.println(endDate);
    

    Output:

    Thu Jan 01 00:00:00 PST 2009
    Fri Jan 02 00:00:00 PST 2009
    

    What needs to be considered is what Calendar actually is.

    A Calendar is not a representation of a date. It is a representation of a calendar, and where it is currently pointing at. In order to get a representation of where the calendar is pointing at at the moment, one should obtain a Date from the Calendar using the getTime method.