We\'ve got an Oracle 11g installation that is starting to get big. This database is the backend to a parallel optimization system running on a cluster. Input to the process

相关标签:
5条回答
  • 2021-01-01 20:10

    Just some thoughts:

    1. I assume you have indexes on all foreign keys. ON DELETE CASCADE will hold row level locks until the Case delete is complete, and with no indexes will hold table locks I believe and be super slow of course

    2. Do you have any deferred constraints? This would most likely slow things down for Oracle cascading through the various table deletes

    3. Have you tried to do the deletes separately for all affected tables (instead of relying on on delete cascade)? Not as easy, but you may be surprised.

    EDIT:

    One more thought. You may consider doing a SOFT delete on Case table, meaning you have a status field that will tell your app if that Case should be considered. This flag could have many different values, but maybe 'A' for active and 'I' for inactive. Assuming you are always using Case as a driving/primary table in joins to other tables, you can avoid the HARD deletes all-together (and occasionally do a cleanup off hours on whatever schedule if you like). Apps would need to be aware of this flag of course, and you'd be tied to joining back to Case table. May or may not fit for your situation...

    0 讨论(0)
  • 2021-01-01 20:13

    CASCADE DELETE runs internally slow-by-slow, er, row-by-row.

    Some options:

    1. Have your purge job snapshot all the cases to be purged into a scratch table with a CTAS. Then have your purge job loop over that table, deleting each case (and its children) individually. This can be unpleasant, especially if you run into millions of descendant rows. We had to change one of the processes recently at [business redacted] which did that to determine which ultimate parents had child counts that would be problematic, and then use a rownum limiter on a delete against the problematic child table(s). It's not fast, but at least it's safer from an undo/redo management perspective by placing an upper bound on how big any transaction can be.

    2. If you're using CASCADE DELETE as a convenience, you could always not do so. You'd have to write a more sophisticated purge routine that deletes from your dependency tree "bottom up".

    3. If you can afford the undo/redo generation on the soft delete, you could range-partition the ultimate parent on DeleteFlag, then partition the children BY REFERENCE, all tables using ENABLE ROW MOVEMENT. You'd incur undo/redo costs for moving the rows when soft-deleted, but when it came time to finally purge, it would be truncating partitions where DeleteFlag = 1, nothing more.

    4. Adding storage is relatively cheap. If there's a date-based retention option, use it, and just have the soft delete option hide the data from the application front end. It's inelegant, but then, so is CASCADE DELETE.

    0 讨论(0)
  • 2021-01-01 20:23

    Not advised for live database.

    1. I disabled the foreign key constraints referencing the table which is slow to delete.
    2. I executed the delete
    3. Enabled the foreign keys again.
    0 讨论(0)
  • 2021-01-01 20:26

    Deleting data is a hell of a job, for the database. It has to create before images, update indexes, write redo logs and remove the data. This is a slow process. If you can have a window to perform this task, easiest and fastest is to build new tables, containing the wanted data. Drop the old tables and rename the new tables. This requires some setup work, that is obvious but is very well possible to make. One step less drastic is to drop the indexes before the delete takes place. My vote would go for CTAS (Create Table As Select from) and build the new tables. A nice partitioning schema would certainly be helpful, maybe in the next release Oracle can combine interval and reference partitioning. It would be very nice to have.

    Disabling logging .... can not be done for deletes but CTAS can use nologging. Make a backup when ready and make sure to transfer the datafiles to the standby database, if you have one.

    0 讨论(0)
  • 2021-01-01 20:36

    Use Enterprise Manager to create a AWR report and run it through statspack analyzer which will give you detailed instructions about the bottlenecks in your system. A AWR report is a textfile containing all kinds of data about what the database has done during a certain time and how long it took.... That statspack analyzer ist sort of an automatic DBA telling you what to do.

    Forget partitions until Statspack Analyzer tells you that they could be useful and you've got a few idle disks that you can use to distribute the I/O.

    Don't think about truncate. It forces a commit...

    BTW, I'm not affiliated with Statspack Analyzer, but I think it's a very viable general tuning approach for Oracle, especially if there's no DBA around.

    0 讨论(0)