Scheduling algorithm which minimizes maximum lateness is optimal (it finds a feasible schedule, if one exists)

后端 未结 0 959
清酒与你
清酒与你 2020-12-31 01:29

I need to understand why if a scheduling algorithm A minimizes maximum lateness, then A is optimal (it finds a feasible schedule, if one exists).

I searched on the we

相关标签:
回答
  • 消灭零回复
提交回复
热议问题