Send PowerBi drill criteria to multiple pages in the same report?

前端 未结 0 1274
囚心锁ツ
囚心锁ツ 2020-12-22 05:38

I have a PBI report that contains a master page M and 3 separate details (drill) pages D1, D2, and D3 from M. I\'m finding that if I left click a record on M and \'drill\' t

相关标签:
回答
  • 消灭零回复
提交回复
热议问题