Finding path with maximum minimum capacity in graph

前端 未结 2 1209
小鲜肉
小鲜肉 2020-12-05 12:11

I am helping a friend with a work related project where, he needs to calculate the maximum capacity from a node a to a node b, where the edge has a capacity. However the max

相关标签:
2条回答
  • 2020-12-05 12:54

    The above answer has been very well explained. Just in case anyone needs an explanation of the correctness of the algorithm, here you go:

    Proof:

    At any point in the algorithm, there will be 2 sets of vertices A and B. The vertices in A will be the vertices to which the correct maximum minimum capacity path has been found. And set B has vertices to which we haven't found the answer.

    Inductive Hypothesis: At any step, all vertices in set A have the correct values of maximum minimum capacity path to them. ie., all previous iterations are correct.

    Correctness of base case: When the set A has the vertex S only. Then the value to S is infinity, which is correct.

    In current iteration, we set

    val[W] = max(val[W], min(val[V], width_between(V-W)))

    Inductive step: Suppose, W is the vertex in set B with the largest val[W]. And W is dequeued from the queue and W has been set the answer val[W].

    Now, we need to show that every other S-W path has a width <= val[W]. This will be always true because all other ways of reaching W will go through some other vertex (call it X) in the set B.

    And for all other vertices X in set B, val[X] <= val[W]

    Thus any other path to W will be constrained by val[X], which is never greater than val[W].

    Thus the current estimate of val[W] is optimum and hence algorithm computes the correct values for all the vertices.

    0 讨论(0)
  • 2020-12-05 13:03

    I would use some variant of Dijkstra's. I took the pseudo code below directly from Wikipedia and only changed 5 small things:

    1. Renamed dist to width (from line 3 on)
    2. Initialized each width to -infinity (line 3)
    3. Initialized the width of the source to infinity (line 8)
    4. Set the finish criterion to -infinity (line 14)
    5. Modified the update function and sign (line 20 + 21)

    1  function Dijkstra(Graph, source):
    2      for each vertex v in Graph:                                 // Initializations
    3          width[v] := -infinity  ;                                // Unknown width function from 
    4                                                                  // source to v
    5          previous[v] := undefined ;                              // Previous node in optimal path
    6      end for                                                     // from source
    7      
    8      width[source] := infinity ;                                 // Width from source to source
    9      Q := the set of all nodes in Graph ;                        // All nodes in the graph are
    10                                                                 // unoptimized – thus are in Q
    11      while Q is not empty:                                      // The main loop
    12          u := vertex in Q with largest width in width[] ;       // Source node in first case
    13          remove u from Q ;
    14          if width[u] = -infinity:
    15              break ;                                            // all remaining vertices are
    16          end if                                                 // inaccessible from source
    17          
    18          for each neighbor v of u:                              // where v has not yet been 
    19                                                                 // removed from Q.
    20              alt := max(width[v], min(width[u], width_between(u, v))) ;
    21              if alt > width[v]:                                 // Relax (u,v,a)
    22                  width[v] := alt ;
    23                  previous[v] := u ;
    24                  decrease-key v in Q;                           // Reorder v in the Queue
    25              end if
    26          end for
    27      end while
    28      return width;
    29  endfunction
    

    Some (handwaving) explanation why this works: you start with the source. From there, you have infinite capacity to itself. Now you check all neighbors of the source. Assume the edges don't all have the same capacity (in your example, say (s, a) = 300). Then, there is no better way to reach b then via (s, b), so you know the best case capacity of b. You continue going to the best neighbors of the known set of vertices, until you reach all vertices.

    0 讨论(0)
提交回复
热议问题