Jmeter - Distributed(Remote) Test Execution is taking too long to complete

后端 未结 0 1674
暗喜
暗喜 2020-11-28 11:27

I am using Jmeter version 5.2.1. I have a scenario to simulate 400 parallel logins and inside the test plan I will execute the test samplers for 20 times using loop controll

相关标签:
回答
  • 消灭零回复
提交回复
热议问题