I am working with jenkins and I would like to run the maven goals when there is a change in the svn repository. I\'ve attached a picture with my current configuration.
I believe best practice these days is H/5 * * * *, which means every 5 minutes with a hashing factor to avoid all jobs starting at EXACTLY the same time.